Skip links

Design Verification & Procurement Standard Design

SCOPE OF WORK

For this contract, the scope of work comprised the design of a stairway that must be incorporated, keeping in mind the safety protection mechanism as per the AS4100 standard.  

Benefit:

• For sooner project delivery, all components were prearranged 
• Ready to procure the Data Generation 
• With the client throughout the process of practical design to manufacturing 
• Possess technical know-how and design capability

SCOPE OF WORK

RU had to operate the platform design and reinforce the original platform with some other structure, bolt fastening, and connecting mechanism design. We welded the supporting structure and finished the workshop, which has also been certified locally.

SCOPE OF WORK

RU has to tail the pipeline system and install an RTK device for setting up the on-site coordinate. For a complete pressure pipe design, we set up ArcGIS for the pipeline location and software conversion.  

This website uses cookies to improve your web experience.
error: Content is protected